影视 A390 线线路迁改工程(弘慧路)施 工 方 案 年 月 日 年 月 日 年 月 日弘源建设工程2024 年 8 月目 录第一章 工程概况与编制说明1.1 工程概况··········································21.2 工程目标··········································21.3 编制说明··········································2第二章 工程组织措施2.1 施工组织机构图····································32.2 施工总平面布置原则································42.3 现场平面布置······································42.4 劳动力计划表······································42.5 施工进度表(见附录)第三章 工程技术措施3.1 施工准备··········································53.2 排管安装与砼包方加固····························63.3 工井施工··········································93.4 沟槽回土·········································10第四章 工程安全措施4.1 安全目标·········································114.2 土建施工危险点预测与预防措施····················114.3 安全生产保证措施·································124.4 施工安全生产具体措施·····························134.5 封道围护·········································144.6 地下管线保护措施·································14第五章 环境保护与文明施工措施5.1 环境保护··········································155.2 文明施工与注意事项·······················...