基坑支护工程专项施工方案编制指南(土钉墙支护)工程名称:文件编号:CSCEC5-FAZN-7(项目自拟编号)发布日期:执行日期:插入项目效果图[工程名称]基坑支护工程专项施工方案(土钉墙支护)目录一、编制说明··········································································11.1编制依据····································································11.2编制人员····································································11.3发放范围····································································1二、工程概况··········································································22.1工程概况····································································22.2基坑概况及特点···························································22.3施工平面布置······························································32.4施工要求及技术保证条件···············································3三、施工计划··········································································53.1施工进度计划······························································53.2材料与设备计划···························································5四、施工管理及作业人员配备和分工············································74.1施工管理人员······························································74.2专职安全生产管理人员··················································74.3特种作业人员······························································74.4其他作业人员······························································7五、施工工艺技术····································································85.1技术参数····································································85.2施工工艺流程······························································95.3施工方法····································································95.4操作要求···································································115...