CHANGE HISTORYREVCHANGE DESCRIPTIONEFF. DATEPREPARED BYAPPROVED BYDEPT.ABCDNEW RELEASEAdd named rulesUpdate 5.1. Add For the series and parallelBattery capacity and cell balance check, when first make sample and first massproduction,update cycle life require, and add appearance check require12/11/202510/15/202510/31/202507/11/2025刘斌刘斌刘斌刘斌陈光辉陈光辉陈光辉陈光辉TETETETECONFIDENTIALITY( )TOP CONFIDENTIAL( )CONFIDENTIAL( )INTERNAL ONLYDISTRIBUTION( )MFG( )QA( )R&D( )FNC( )PMC( )PME( )SRC( )HR&A( )S&M( )PRJ( )IE( )TE(BCU( OTHER ))ISSUE NO.:1. Purpose (目的)法律规范本公司产品新产品设计验证测试项目、测试条件及判定标准Standardize the new product design verification test item、 test condition and criteria.2. Scope (范围)适用于本公司新研发的所有型号电池产品Applicable to all the new battery products3. Definition ( 定义)设计验证:对产品的电池功能,可靠性,安全性进行验证, 确保产品符合设计要求Design verification: verify the batteries protect function, reliability, safety whether meet the spec definition make sure the batteries meet design requirement.4. Responsibility ( 职责权限)4.1 R&D (研发部):编制新产品设计计划,计划输入输出/ 输出, 完成客户产品的定义,输出产品规格书,新样品样板制作,设计转移,新零件/ 模具承认,编制产品规格书 Prepares the new product design planning, design input/output, Provide the product definition and specification basing on customer’s request. sample making, design transfer, the new Parts/molds verification, establishment product specification4.2 PRJ (项目工程部):和客户沟通产品的需求,编制及执行品质控制计划,跟踪项目研发,负责安排样品试制,产品试产至量产全过程,对项目成不及项目过程中的风险进行控制, 跟踪过程问题至解决。 Communicate with customer, understand customer’s requirement. Prepare and implement quality control flow chart (QCFC).Track the entire process of project from R&D,...