电脑桌面
添加小米粒文库到电脑桌面
安装后可以在桌面快捷访问

项目暖通系统调试方案

项目暖通系统调试方案_第1页
1/15
项目暖通系统调试方案_第2页
2/15
项目暖通系统调试方案_第3页
3/15
System Commissioning Plan (HVAC System)系统调试方案(暖通系统)Edited by编 制:___________Reviewed by审 核:___________Approved by批 准:___________2025-12-21Table of Contents目 录 1. Project description工程概况 2. Reference and explanation编制说明及依据 3. Organization chart and responsibility division调试组织机构图及岗位职责4. HVAC commissioning暖通系统调试5. Safety measurements安全措施Attachment: Commissioning schedule Equipment unit operation record Air speed and volume record 附表: 试车进度计划设备单机试运转记录 风速、风量记录1.Project description工程概况According to owner’s requirements, commissioning of equipment installed for unit operation will be performed. Projects include electrical lighting system, utilities system, telecommunication system, fire fighting system, HVAC system, 9902 storm water pump station and installation of electrical hoist etc.应业主要求对本项目的已安装完的设备单机试运转。本工程共分电气照明系统、动力系统、电话网络系统、消防系统、暖通空调工程、9902 雨水泵站、电动葫芦安装等工程2. References and explanation编制说明及依据2.1Explanation编制说明2.1.1This plan mainly explains organization and safety measurements of system; unit operation and system commissioning for HVAC system.本方案主要讲述系统的组织及安全措施;暖通空调系统的单机试运转及系统调试.2.1.2Discipline plans for utilities and electrical system,, telecommunication system, fire fighting system (including unit operation for pumps), 9902 storm water pump station (including pumps), test operation and commissioning for electrical hoist will be provided as appendixes of this plan.动力电气系统、电话网络系统、消防系统(含泵设备单机试运转)、9902雨水泵站(含泵设备)、电动葫芦安装的试运转、调试专业方案作为此方案的附件另行提供。2.2Reference编制依据:2.2.1 Code for construction and acceptance of ventilation and air-conditioning《通风与空调施工质量...

1、当您付费下载文档后,您只拥有了使用权限,并不意味着购买了版权,文档只能用于自身使用,不得用于其他商业用途(如 [转卖]进行直接盈利或[编辑后售卖]进行间接盈利)。
2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。
3、如文档内容存在违规,或者侵犯商业秘密、侵犯著作权等,请点击“违规举报”。

碎片内容

项目暖通系统调试方案

确认删除?
VIP
微信客服
  • 扫码咨询
会员Q群
  • 会员专属群点击这里加入QQ群
客服邮箱
回到顶部