某塑料厂商业综合楼施工方案及进度计划编制目录第一章工程概况及施工特点分析···················01第一节工程建设概况····················01第二节建筑设计特点····················01第三节结构设计特点·····················第四节工程施工特点·····················第五节建设地点特征·····················第六节工程地质条件·····················第二章施工方案··························第一节施工程序·······················第二节施工流向·······················第三节施工顺序·······················第四节施工方法和施工机械··················第三章单位工程施工计划······················第一节确定施工过程·····················第二节计算工程量······················第三节单位工程施工安排···················第四章资源需要量计划·······················第一节劳动力需要量·····················第二节施工机械需要量····················第五章拟定施工措施························第一节技术组织措施·····················第二节安全措施·······················第三节文明施工·······················第四节成本管理及减低成本措施················第五节新技术的推广·····················参考文献·····