世纪明珠施工组织总设计****建设集团公司编二00一年四月二十一日目录一、工程概况···················································(3)1、工程构成概况··············································(3)2、建筑项目的建设、设计和施工单位················(3)3、建设地区自然条件概况··································(5)二、施工部署···················································(7)1、项目组织机构形式········································(7)2、总施工顺序安排···········································(8)3、总项目工期目标···········································(9)三、全场性施工准备工作计划······························(9)1“”、三通一平工作···········································(9)2、临时设施计划··············································(9)3、技术工作准备·············································(12)四、施工总进度计划········································(13)五、施工总平面布置········································(14)六、主要项目施工方案·····································(16)1、土方开挖···················································(16)2、地下室基坑支护··········································(16)3、模板支撑及用料··········································(17)4、钢筋安装及焊接··········································(17)5、砼拌制、运输·············································(17)6、外架搭设···················································(17)7、水平及垂直运输··········································(18)8、季节性施工措施··········································(18)9、单位工程施工组织设计编制要求·····················(19)10、2#楼高层建筑施工方案·······························(19)七、施工总质量计划········································(21)1、工程质量目标·············································(21)2、建立质量保证体系·······································(21)3、确定施工质量控制点····································(23)八、施工总资源计划········································(23)1、主要施工材料需用量计划······························(23)2、主要施工机械设备需用量计划·...