管理制度中国葛洲坝集团电力有限责任公司大城县15兆瓦光伏发电工程项目部目录第一篇:分包单位管理制度一、分包队入场手续办理管理规定····································2二、分包队管理人员考勤制度·······································3三、分包商民技工考勤与工资发放管理办法····························4四、分包队营地管理规定············································14五、分包队安全文明施工奖惩制度····································21第二篇:安全文明生产管理制度六、分包队安全文明施工管理总则····································27七、安全文明施工责任制············································29八、安全施工教育培训制度··········································37九、安全交底制度··················································39十、安全施工检查制度··············································41十一、安全文明工作例会制度········································44十二、现场文明施工环境保护管理制度································46十三、施工垃圾和废旧物资管理规定··································48十四、脚手架搭设、拆除、使用管理制度······························50十五、特种作业人员管理制度········································52十六、临时用电管理制度············································54十七、消防保卫管理制度············································56十八、防护用品、安全设施管理及使用制度····························58十九、车辆交通安全管理制度········································62第三篇:施工质量管理制度二十、施工现场工程质量管理制度总则································65二十一、技术资料管理制度··········································67二十二、样板工程管理制度··········································69I二十三、质量检查验收制度··········································73二十四、工程质量挂牌制度··········································75二十五、隐蔽工程验收制度··········································76二十六、技术交底制度··············································78二十七、设备、材料管理制度········································80第四篇:质量通病防止手册二十八、光伏电站质量通病防止手册··································81III0II第一篇:分包单位管理制度01分包队入场手续办理管理规定目的:为了加强对劳务分包单位人员的管理,使所选择的分承包方能满足我项目部的要求,以确保整个工程质量和进度...