第1页共185页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共185页三星级酒店装饰施工组织设计目录一、工程概况···········································二、施工组织管理架构及职责分工························、施工组织管理架构·······························、施工组织管理机构岗位职责分工··················三、施工方案及平面布置·································、施工准备········································、施工准备·······································第2页共185页第1页共185页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第2页共185页、施工工艺流程····································、结合本工程的特点建立项目管理制度···············、施工平面布置···································四、材料设备及劳动力计划······························、装修材料的进场验收计划·························、装修材料的质量保证·····························、材料进场保证措施·······························、劳动力配置计划·································第3页共185页第2页共185页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第3页共185页、主要施工机具配备表··