苏州绿地中央广场项目地块三地库区域停工保护方案目录1、编制目的及适用范围··································································22、编制依据·············································································23、停工工程概况·······································································24、停工部署············································································34.1、停工安排···········································································34.2、停工期间主要工作内容·······························································35、停工具体工作安排及做法·······························································35.1、现场清理·········································································35.2、成品保护·········································································4(1)、钢筋··············································································4(2)、地库区域的降水····································································4(3)、后浇带部位保护···································································6(4)、F区、G区原土保护··································································105.3、主要材料机械设备退场······························································10(1)、周转材料·········································································10(2)、钢筋加工设备及木工设备···························································115.4、人员退场··········································································116、施工组织设计········································································117、项目正常运转保障措施································································117.1、人员组织保障····································································117.2、进度质量保障···············································...