新疆广汇哈密煤化工项目动力站工程烟囱施工安全专项施工方案目录一、工程概况及特点········································2二、编制依据··············································2三、施工计划··············································2四、施工工艺技术··········································5五、施工安全保证措施······································5六、劳动力计划···········································12七、计算书················································13附件:1、烟囱工程施工平面图迪尔集团有限公司第1页新疆广汇哈密煤化工项目动力站工程烟囱施工安全专项施工方案一、工程概况本工程为广汇哈密煤化工项目动力站烟囱工程,本期工程共2个150米烟囱,基础底部直径25
96米,顶部出口直径5
烟囱为单筒钢筋混凝土结构
二、编制依据1、《建筑施工高处作业安全技术规范》JGJ80-912、《电力建设安全工作规程》(火力发电厂部分)DL5009
1-923、《电力建设安全健康与环境管理工作规定》4、《危险性较大的分部分项工程安全管理办法》5、建筑机械使用安全技术规程(JGJ33-2001)6、《烟囱施工图》7、《土建专业烟囱施工方案》8、国务院建设部建质〔2004〕213号文件《危险性较大工程安全专项施工方案及专家论证审查办法》三、施工计划3.1施工进度计划根据当地气候条件等原因,筒身全部砼浇筑、内衬砌筑、平台制作安装及外装饰,综合考虑总工期305天
3.2工程所需