1/50编号No.暖通系统施工方案StateMethodforMechanical编制人Preparer:审核人Reviewer:审批人Approver:编制日期Date:XX工程技术有限公司XXEngineeringCo.,LtdI目录第一章编制依据.............................................1第二章工程概况.............................................2第三章施工准备.............................................43.1施工人员准备..........................................43.2施工技术准备..........................................43.3深化设计...............................................53.4施工现场准备...........................................73.5主要施工机械设备表及进场计划...........................73.5.1施工机械准备........................................73.5.2施工机械配置及进场计划..............................83.5.3施工机械管理措施...................................103.6主要施工材料供应.......................................103.6.1施工物资准备.......................................103.7主要人力资源安排......................................11第四章通风、空调工程施工方法及施工工艺....................124.1通风、空调工程总体施工流程图...........................124.2风管及部件制作施工方法、施工工艺.......................134.2.1施工工艺流程.......................................134.2.2操作工艺...........................................134.2.3风管系统安装.......................................19II4.3通风与空调设备安装.....................................224.3.1材料设备检查.......................................224.3.2作业条件...........................................224.3.3设备现场运输.......................................234.3.4设备就位调整.......................................234.3.5风机盘管安装.......................................264.3.6组合式空调机安装...................................274.3.7通风机安装.........................................284.3.8分体式空调机组安装.................................28第五章空调水系统安装......................................315.1流程图................................................315.2空调水系统施工操作要点.................................32第六章质量证措施..........................................376.1分项工程质量控制程序.................................376.2质量保证措施...........................................376.2.1过程控制有效制度...................................376.2.2做好超前技术准备工作...............................396.2.3建立健全监控机制...................................406.2.4加强施工队伍的管理,确保操作质量...................406.2.5严把材料关,防止劣质材料进场.......................406.2.6严格工序管理.......................................41III6.2.7加强成品保护,确保工程免受人为损失.................416.3主要分部分项工程质量控制措施...........................416.4成品保护措施...........................................42第七章安全保证措施........................................43第八章绿色施工技术措施....................................458.1环境控制..............................................458.2“四节”要求.........................................461第一章编制依据1.《建筑工程绿色施工评价标准》(GB/T50640-2010)2.《通风与空调工程施工规范》(GB50738-2011)3.《通风与空调工程施工质量验收方案》(GB50243-2002)4.《机械设备安装工程施工及验收通用规范》(GB50231-2009)6.《工业金属管道工程施工方案》(GB50235-2010)7.《工业设备及管道绝热工程施工方案》(GB50126-2008)8.《压缩机、风机、泵安装工程施工及验...