word格式文档专业整理中国石油青海油田格尔木炼油厂重油催化裂化消除瓶颈改造工程余热锅炉防腐施工方案编制人:审核人:批准人:建设单位批准人:陕西化建格尔木炼油厂产品质量升级改造项目经理部陕西化建格炼产品质量升级改造工程项目经理部2目录一、编制说明················································3—3页二、工程概况················································3—3页三、编制依据·················································3—3页四、施工技术要求············································3—5页陕西化建格炼产品质量升级改造工程项目经理部3五、施工前准备工作:········································5—6页六、施工技术准备··············································6—6页七、质量保证措施··············································6—9页八、进度控制措施·············································9—10页九、安全文明施工措施·····························陕西化建格炼产品质量升级改造工程项目经理部4··········10—12页十、职业健康安全管理措施··································12—13页十一、环境保护实施要求·····································13—13页一、编制说明:本方案依据中国石油天然气华东勘察设计研究院设计要求,编制而成。此方案为中国石油青海油田格尔木炼油厂产品质量升级重油催化裂化消除瓶颈改造工程余热锅炉(第一再生器CO余热锅炉、第二再生器余热锅炉)防腐施工方案二、工程概况:余热锅炉(第一再生器CO余热锅炉、第二再生器余热锅炉)是中国石油青陕西化建格炼产品质量升级改造工程项目经理部5海油田格尔木炼油厂产品质量升级改造工程重油催化裂化消除瓶颈改造工程中的重要设备。三、编制依据:SH3022-1999《石油化工设备与管道涂料防腐蚀技术规范》。GB8923—1988《涂装前钢材表面锈蚀等级和除锈等级》。GB/T1720漆膜附着力测定法。GB1733-93漆膜耐水性测定法。GB1768-88漆膜耐磨性测定法。GB1764-88漆膜厚度测定法。设计图纸四、施工技术要求:1、施工程序:施工准备——喷砂除锈——报验——刷第一遍底漆——报验----刷第二遍底漆——报验——刷第一遍面漆——报验----刷第二遍面漆——检查验收。(1)设备梯子、平台防腐:施工准备——喷砂除锈——报验——刷PNF-01荧丹含氟防腐涂料底漆第一遍——报验----刷PNF-01荧丹含氟防腐涂料底漆第二遍----报验----刷PNF-03荧丹含氟防腐涂料面漆第一遍——报验----刷PNF-03荧丹含氟防腐涂料面漆第二遍——检查验收。2.施工要求:喷砂除锈,去除表面材质表面铁锈、尘土、油污,第一遍底漆漆膜干燥后,刷防腐第二遍底漆,等第二遍底漆漆膜干燥后,刷防腐面漆第一遍,等第一遍陕西化建格炼产品质量升级改造工程项目经理部6面漆漆膜干燥后,刷防腐面漆第二遍。3.施工报验流程(见下表)五、施工前准备工作:为确保工程顺利施工,施工前必须把准备工作安排妥善。不合格不合格不合格不合格不合格不合格合格喷砂除锈、刷第一遍底漆材料报验刷第二遍底漆刷防腐面漆一遍刷防腐面漆二道交工验收喷砂除锈、刷第一遍底漆退货合格合格合格合格刷第二遍底漆刷防腐面漆一遍刷防腐面漆二道陕西化建格炼产品质量升级改造工程项目经理部7首先施工人员要提前到位,根据该工程范围及工程所制订施工进度计划,我方由施工经理直接监督,现场安排项目经理一名负责全面管理工作,专职技术员1名,对现场所有技术工作进行协调和看护,并随时解决施工人员...