中国煤炭科工集团太原研究院倒班公寓楼工程施工组织设计山西省宏图建设工程有限公司二零一二年十二月审批:审核:编制:本施工组织设计仅供本工程使用受控有效期:2012 年 12 月 20 日~2014 年 7 月 30 日目 录1 编制依据1
1 设计图纸及合同·····················6 1
2 主要规程、规范、标准··················61
3 主要图集·························71
4 主要法规·························72 工程概况2
1 建筑概况·························72
2 结构概况························102
3 安装概况························112
4 施工现场条件······················162
5 施工合同要求······················162
6 工程控制重点及难点···················163 施工组织部署3
1 工程项目目标······················173
2 施工组织························173
3 施工方案························193
4 试验、检验、测量、计量设备投入计划表··········223
5 施工方案编制计划····················233
6 检验批划分及分项、分部工程验收标准···········233
7 主要施工机具计划表···················274 主要分部分项工程施工方法及技术措施4
1 测量放线························284
2 土方开挖························29 4