下载后可任意编辑工作招标论文:工程量清单计价模式下的招投标 【摘 要】自 2000 年《招标投标法》施行,招投标制度确立了在建设市场中的主导地位,竞争已成为市场形成工程造价的主要形式。为适应我国加入 WTO 与国际惯例接轨的要求,2024 年 7 月 1 日起,将根据《建设工程工程量清单计价法律规范》全面推行工程量清单计价模式,即:“法定计量、信息指导、自主报价、竞争定开”。 【关键词】工程量;清单计价;模式;招投标 Under resilience detailed list valuation model move of bid Zhou Xin 【Abstract】“Tender Tender” executed from 2000, incurred the bid system to establish in the construction market dominant position, the competition has become the market to form the building cost of projects the main form. In order to adapt our country to join WTO and the international convention trail connection request, on July 1, 2024, will defer to “Construction project Resilience Detailed list Valuation Standard” the comprehensive carrying out resilience detailed list valuation model, namely: “the legal measurement, the information instruction, the independent quoted price, the competition decide”. 【Key words】Resilience; Detailed list valuation; Pattern; Incurs the bid 自 2000 年《招标投标法》施行,招投标制度确立了在建设市场中的主导地位,竞争已成为市场形成工程造价的主要形式。为适应我国加入 WTO 与国际惯例接轨的要求,2024 年 7月 1 日起,将根据《建设工程工程量清单计价法律规范》全面推行工程量清单计价模式,即:法定计量、信息指导、自主报价、竞争定开。 我国建设工程施工招投标制度,始于 20 世纪 80 年代中期,目的是引起施工企业的竞争,以便择优录用。但是,在过去定额模式的计价方式中,调节承发包双方利益和反映市场价格等方面存在许多不适应的地方,特别是在公开、公平、公正竞争方面,还缺乏合理完善的机制。这是一种滞后于现代经济进展的招投标模式,同时还会派生出其他的问题,比如权力的干预、假招标和滋生腐败等,使得招投标的根本目的并没有达到。要实现建设市场的良性进展,除了加强行政监管以外,发挥市场规律中竞争和价格作用才...