涉外 epc 工程合同篇一:国外某工程EPC合同 2 某国外工程EPC合同 2 APPENDIX 2 CONTRACT DATA SHEET 附件 2 合同数据表Name of Contract: EPC Contract on XX2× 220MW Thermal Power Plant 合同名称 : XX2 ×220MW火电厂 EPC总承包合同APPENDIX 3 (GC) - INSURANCE REQUIREMENTS 附件 3 (GC) – 保险要求Insurance to be taken out by the Contractor
承包商承担保险:In accordance with the provisions of GC34, the Contractor shall at its expense take out and maintain in effect, or cause to be taken out and maintained in effect, during the performance of the Contract, the insurance set forth below in the sums and with the deductibles and other conditions as specified
The identity of the insurers and the form of the policies shall be subject to the approval of YY
The costs for insurance to be included in Bid price 依照第GC34 部分之规定,在合同履行期间,承包商负责投保或促成投保以保持该保险有效,保险金额、扣除条款及其他条件规定如