目录 Contents 1.0 工程概况General ...................................................................................................... 1 2.0 编制依据 Reference documents ................................................................................ 1 3.0 泵设备实物量Physical quantity of pumps .................................................................. 1 4.0 施工措施及质量要求Construction measures and quality requirements ...................... 3 5.0 质量保证措施 Quality assurance measures .............................................................12 6.0 安全保证措施 HSE Assurance Measures .................................................................13 7.0 成 品 保 护 Final product protection .......................................................................14 8.0 施工机具、 量具及手 段 用 料 Construction machinery, measurement tools and supporting material ...................................................................................................14 9.0 施工进度计划 Construction progress schedule .........................................................16 10.0 劳动力使用计划 Manpower deployment plan ...........................................................16 Page 1 of16 1.0 工程概况General 拜耳异氰酸酯和聚醚项目MDI 联合装置罐区共有各种类型泵约67 台;其中V911 罐区15 台,V912 罐区21 台,V913 罐区31 台;均安装在地面层。所有泵现场安装后,原则上不进行拆检。泵的单机试用祥见《动设备单机试用方案》。There are totally 67 pumps of various types installed in the tank farm of MDI Complex of Bayer Isocyanate and Polyether Project; among which 15 sets in V911 tank farm, 21 sets in V912 tank farm and 31 sets in V913 tank farm; all these pumps are installed on ground level. All pumps will not be dismantled for inspection in principle after installation at site. Detail procedures for pump solo ru...