MS001 DATE 05/5/08Method StatementFor : Excavation less than 2 metersOwner : LafargeContractor: CBMIEstabliSafety manager:Owner Approve(Site Manager) : □yes □yes with comment □ NOSafety Manager : □ yes □yes with comment □NOMSOXX Date: X/01/2024Method StatementFOR: cement silo concrete casting scheme水泥库混凝土浇筑方案Owner: LafargeContractor: CBMIEstablished by:Checked by:Safety manager:Owner Approve(Site Manager) : □yes □yes with comment □ NOSafety Manager : □ yes □yes with comment□ NOCBMI Construction Co., LTD.Uganda ProjectVersion:11.Work title: Slipform construction 工作名称:滑模The method statement includes: all the slip form work on site包括:现场所有滑模工作。2.Description:(说明)1)Explanation of the process(过程说明)Surveying 测量放线Foundation construction have been finished 基础部分施工Revise the reinforcement 钢筋绑扎效正 Fixing and aligning brackets 支承开支架组对调平Fixing and aligning formwork 模板拼装加固、找正Connecting and laying oil pipes 各油路管连接铺设Fixing board on work platform 铺设平台板并固定Setting up platform for reinforcement and other material。 搭设支承架放钢筋等材料Fit climbing rod and hydraulic equipment and aligning 扒杆就位、液压设备就位效正Leveling and aligning the whole assembly work platform 整体调平、找正Connect electrical equipment with power 电气设备电源连接Commissioning 滑模设备就位调试Check hydraulic equipment to make sure all the equipments are in good condition ;检查液压设备状态是否良好Safety induction regarding slip forming works was delivered to operators and other workers, everybody wears the right PPE;安全交底,并穿戴 PPEBarricade the working area。安全围护Set up emergency passage .修建逃生通道上部做防护Switch on after checking. 检查并合上电闸Slip form work starting. 滑模正...