工业大学华立学院本科毕业设计(论文)4×200MW 火力发电厂电气部分设计系 部 机械电气学部 专业 电气工程与其自动化 2024 年 6 月摘 要本设计主要 4×200MW 火力发电厂电气部分设计包括电气主接线设计;发电机与变压器的连接形式选择;发电厂厂用电设计;主变压器、启动/备用变压器和高压厂用变压器容量计算、台数和型号的选择;220kV 高压配电装置配置原则;短路电流计算和部分高压电气设备的选择与校验;发电机与变压器保护配置,根据设计规与规定完成上述设计工作。关键词:发电厂;电气一次部分;短路计算;电气设备选择AbstractThis design takes Electrical design of 4 × 200MW power plant, including the main electrical wiring design; choice of generators and transformers connecting form; auxiliary-part design; choice of main transformer, start / back-up transformers and high voltage transformer factory capacity calculation, number and type; configuration rules of 220kV high-voltage power distribution device; short-circuit current calculation and high-voltage electrical equipment selection and validation; generator and transformer protection configuration, in accordance with design specifications and requirements to complete the design work.Keywords: power plant; electrical first part; short-circuit calculation; selection of electrical equipmentsKeywords:power plant; electrical first part; short-circuit calculation; selection of electrical equipments目录1 绪论 11.1 概述 11.2 毕业设计主要容 11.2.1 电力系统情况 11.2.2 待设计火力发电情况 21.2.3 设计容 22 发电厂电气主接线 52.1 概述 52.2 电气主接线的确定与验证 52.2.1 电气主接线的设计原则 52.2.1 电气主接线的初步方案 62.3.1 有关设计原则 82.3.2 本厂发电机与变压器之间的连接 93 发电厂用电设计 123.1 厂用电设计的要求 123.1.1 厂用负荷分类 123.1.2 基本要求 123.2.2 本厂厂用电主接线设计说明 144 短路计算 184.1 短路计算的目的 184.2 短路计算的一般规定 184.1.1 短路计算的一般规定 184.1.2 系统简化 194.1.3 本厂等值电...