目录第一章:概述································编制依据···································编制原则···································工程简介···································工程主要特点·································工程主要难点及施工对策····························第二章:施工进度计划安排···························.原则····································.施工组织··································.工期控制与分阶段目标····························现场临设布置·································工、料、机,用款计划····························工程主要材料·································工程协调···································施工准备···································交通导行···································第三章:施工方案································测量控制··································施工工序···································第四章:雨季施工措施······························第五章:质量目标及质量保证措施·························质量目标···································质量保证体系·································项目部主要领导质量职责····························文件控制···································产品标识和可追溯性······························质量保证—过程控制······························分部、分项工程质量保证措施··························检查、验收、组织程序·····························本工程检验标准································第六章:安全管理体系及消防保卫措施·······················安全保证措施·································消防保卫、健康体系及措施···························第七章:工期保证措施······························第八章:文明施工及环境保护措施·························文明施工···································环境保护措施·································第九章:成品保护措施······························第十章:节约材料措施······························第十一章:技术创新·······························第十二章:分包计划和管理措施··························第十三章:与监理、设计配合措施·························附图附表部分第1页共36页编号:时间:20...