目录1.编制总说明1.1编制依据············································31.2工程概况············································51.2.1总体说明··········································51.2.2基础工程概况·····································61.2.3主体工程概况······································61.2.4施工进度要求······································61.2.5施工条1/53件··········································62.施工部署2.1施工方案与流程······································72.2施工管理组织机构及责任明细··························72.3施工总进度计划······································92.4施工准备············································92.4.1技术准备·····························.···········102.4.2材料准备·········································102.4.3施工机械布置····························2/53·········122.4.4施工平面布置说明·································132.4.5施工机械进场计划·································142.5用水用电安排·······································162.6劳动力安排计划·····································172.7质量保证措施·······································172.8建筑成品及半成品保护措施···························182.9安全管理措施·······································182.10雨季及高温天气施工技术措3/53施························202.11消防保卫及现场材料管理措施························212.12施工现场卫生管理措施······························223.分项工程施工方案3.1放线测量···········································243.2土方工程···········································253.3基础工程···········································263.4脚手架工程·········································263.5模板工程···········································274/533.6钢筋工程···········································273.7混凝土工程·········································293.8预应力混凝土工程···································323.9地下室防水工程·····································323.10砌体工程··········································333.11屋面防水工程······························...