国帆路站侧墙大型钢模板施工交流目录1大型钢模板简介..............................................................................................................................................21.1结构形式..............................................................................................................................................21.2大钢模组成规格................................................................................................................................22施工过程............................................................................................................................................................52.1施工流程..............................................................................................................................................52.2人员设备..............................................................................................................................................62.3施工进度..............................................................................................................................................62.4成本费用..............................................................................................................................................62.5国帆路站施工图片展示...................................................................................................................73存在问题及采取措施..................................................................................................................................113.1拼缝漏浆...........................................................................................................................................113.2表面气泡...........................................................................................................................................123.3结构烂根...........................................................................................................................................124大型钢模改进探讨.......................................................................................................................................1313/11大型钢模板简介支腿钢模板支腿连结型钢调整螺栓结构底板1.1结构形式三大型钢模主要结构由侧墙钢模面板、国帆路站大型钢模施工借鉴青浦站大钢模经验,3部分组成。角桁架、预埋件等1.2大钢模组成规格面板1.2.1钢板;施工采用上下双拼,尺Q235的,厚度为,高度为)面板宽度为(12m2.1m6mm寸。2m*4.2mM20×60mm,)连接螺栓用2(各块板之间通用互换。3)各板连接相同规格必须互换。(φ21.5mm)安装桁架处的连接孔为4(连接钩头螺栓。13/21面板结构图1.2.2三角桁架中成一体,由定做方自行处理。1)各桁架用φ48×3.5(连接螺栓。连接孔φ21.5mm。)模板与模板之间连接用(2M20×60)调节螺栓用于调节桁架外口高度。(3)型钢尺寸见详图。4(13/32图三角桁架结构预埋件1.2.3详见侧墙大钢模剖面布置图。锚固长度按设计要求,32mm预埋地锚钢筋并设置接驳器,13/4侧墙大钢模剖面布置图3图施工过程2施工流程2.1大模板施工流程如下:)底板施工,预埋地锚钢筋并设置接驳器,锚固长度按设计要求;(12)绑扎侧墙钢筋;(3)安装大模板及支架,固定并准确定位;(;)浇筑下二层侧墙(4.2m大模板高度)(4离壁墙与中板同步浇筑,搭设满堂支架及对撑支架,浇筑中板及其以下剩余侧墙,5()中板上预埋地锚待浇筑下一层侧墙时拆除,离壁沟内设置木箱作为离壁墙及侧墙内侧模板,钢筋,地锚钢筋设于离壁墙外侧;)绑扎下一层侧墙钢筋,搭设侧墙模板。大模板...