工作计划表甘特图表实际进度表项目开始时间时间周期结束时间项目开始时间时间周期目前完成量开始时间时间周期结束时间3/2/2020133/19/20203/2/202010103/2/202083/12/2020100%3/12/2020154/2/20203/12/20202110.53/12/2020154/2/202050%3/23/202084/2/20203/23/20201073/23/202084/2/202070%3/28/2020204/27/20203/28/202030273/28/2020204/27/202090%4/6/2020114/21/20204/6/20201504/6/2020114/21/20204/22/2020125/13/20204/22/20202104/22/2020125/13/20205/8/202095/21/20205/8/20201305/8/202095/21/2020实际工程项目工作计划表(甘特图)完成%项目1项目1(8天)项目2项目2(15天)项目3项目3(8天)项目4项目4(20天)项目5项目5(11天)项目6项目6(12天)项目7项目7(9天)选择:项目1(8天)项目2(15天)项目3(8天)项目4(20天)项目5(11天)项目6(12天)项目7(9天)3/2/20203/12/20203/22/20204/1/20204/11/20204/21/20205/1/20205/11/2020