目 录一、工程概况.................................................1二、施工部署.................................................12.1 施工准备...............................................12.2 作业条件................................................32.3 质量管理小组............................................32.4 劳动力计划..............................................42.5 施工进度计划............................................4三、施工工艺.................................................43.1 施工流程................................................53.2 底板防水层的施工........................................53.3 立面防水层施工..........................................93.4 注意事项...............................................11四、质量标准及保证措施......................................124.1 质量标准:.............................................124.2、质量验收.............................................134.3 质量控制措施...........................................144.4 成品保护...............................................154.5 质量缺陷防治...........................................15五、安全、环保措施..........................................16杭锦后旗电力调度中心地下室防水施工方案编制依据1杭锦后旗电力调度中心施工图纸2地下室防水技术规程GB50108-20013地下防水工程施工质量验收规范GB50208-2002一、工程概况杭锦后旗电力调度中心工程建筑面积约 7900 平米,地上 10 层,地下 1 层。结构类型为框架-剪力墙结构,基础形式:主楼部分为平板式筏板基础厚 0.9 米、附楼部分为独立基础。建筑物持力层为粉细砂层,承载力为 140KPa,主楼地基采用喷粉桩复合地基,承载力要求大于400KPa。地下水位在-2.5m 左右。本工程地下室防水工程采用结构自防水和柔性防水相结合。防水等级为二级。结构自防水采用添加 UEA 高抗裂型防水剂的防水密实混凝土,其抗渗等级为 S8。柔性防水采用防水卷材,防水卷材为 SBS 改性沥青防水卷材。二、施工部署2.1 施工准备2.1.1 施工手续及证件所有防水施工人员必须具备《职业技能岗位证书》、《×市安全资格上岗证》及《暂住证》等准许施工证件且证件在有效期内。2.1.2 技术准备2...