国际工程管理实务与翻译(08-09) 作业实用翻译价格清单中的固定总价和单价应被视为包括标书和合同文件中所述的全部工作,合同项下所述的工作实施和承包商义务履行所需的服务及其他工作,无论此清单中详细描述与否。Fixed price and unit price in the price list shall detail lists of all items of work specified in the tender and the contract, works execution required to be carried out in the contract, services needed to fulfill the contractor’s obligation and other works, whether giving a detail description in the price list or not. 所有与本工程项目有关的针对承包商的或业主要求承包商缴纳的税金、保险费,以及政府和非政府部门征收的各种费用。除另有说明外,所填写的单价将被认为已包含一切执行及完成该项目所须的费用,包括材料、人工、搬运、储存、裁切、耗损、吊运、定位、安装、包装、工具、器械、折旧,辅助人工和材料以及辅助措施,营业费、税务、开办费、行政支援、利润、分段执行、检验检测、验收、返工、加班、恶劣气候条件的防护保证措施、清洁清理、成品保护、保险、政府部门应收费用等等所有相关的费用。The unit price of all the taxes, insurance, and expenses levied by the government and non-government sector, which are consistent with Contractor’s obligation relevant to the works or required by the employer, shall be deemed to cover all the expenses needed in the execution and completion of works, unless otherwise stated, including materials, manual work, transport, storage, cropping, wastage, swing, location, erection, tools, instruments, depreciation, auxiliary manpower and materials, support measures, operating expenses, taxes, organization cots, administrative support, profits, split-phase operations, inspection and detection, acceptance, reworking, extra work, safeguard measures adopted in atrocious weather, cleanness, finished products protection, insurance, expenses receivable by the government and other expenses related. FIDIC 翻译8.3P...