下载后可任意编辑室内墙地砖施工方案 编制人:审核人:审批人:二○一三年四月二十日目 录一、工程概况......................................................3二、编制依据......................................................4三、施工机具准备..................................................41下载后可任意编辑1、机具准备......................................................42、材料准备......................................................4四、工艺流程......................................................4五、操作工艺......................................................51、地面贴瓷砖施工工艺:..........................................52、墙面贴瓷砖施工工艺:..........................................6六、注意事项......................................................7七、验收标准及质量控制要点........................................81 、验收标准.....................................................82、 墙面砖质量控制要点:.........................................83、地砖质量控制要点:............................................9八、成品保护......................................................9九、安全环保措施.................................................10一、工程概况1、工程名称:2、工程地址: 3、建设单位: 4、设计单位: 5、监理单位: 6、施工单位:7、建筑规模:建筑面积:61294m2;层数:地上五层局部四、二层;建筑高度:26.25m;±0.000 标高:808.15m;基底:805.8(相对标高为-2.35m,局部-2.50m)建筑功能:教学;结构类型:框架结构;基础形式:筏板基础、独立二、编制依据1、《建筑地面工程施工质量验收法律规范》(GB50209-2024)2、《建筑工程施工质量验收统一标准》(GB50300-2001)3、《建筑装饰装修工程质量验收法律规范》GB50210-20014、本项目工程的图纸设计要求三、施工机具准备1、机具准备中型石材切割机、砂灰拌制盘、瓷砖运输专用车、泥桶、砂灰搅拌器2下载后可任意编辑手推车、铁锹、靠尺、浆壶、水桶、喷壶、铁抹子、木抹子、墨斗、钢卷尺 、尼龙线、橡皮锤(或木锤)、铁水平尺、弯角方尺、钢錾子、合金钢扁錾子 、台钻、合金钢钻头、笤帚、砂轮锯、钢丝刷。2、材料准备材料进场报验要严格把关:其品种、规...