装饰工程临电临水施工方案目 录第一章、临时用电方案..................................................................3一、编制依据..................................................................3二、工程概况..................................................................3三、施工机械配置情况..........................................................31.装饰施工阶段施工用电动机械设备配备..........................................32. 装饰施工阶段施工用电焊机...................................................43. 装饰施工现场所需照明灯具...................................................5四、用电负荷计算..............................................................5五、施工现场用电布置及临时用电负责人..........................................61、总配电箱设置...............................................................6六、导线的截面规格的选择......................................................6七、安全用电技术措施和电气防火措施............................................71、安全用电技术措施...........................................................72、电气防火措施...............................................................8八、触电急救..................................................................9第二章、临时用水方案.........................................................10一、编制原则.................................................................10二、编制依据.................................................................10三、临时施工给排水...........................................................10四、现场用水的保证措施.......................................................11第一章、临时用电方案一、编制依据本方案编制依据如下:《施工现场临时用电安全技术法律规范》(JGJ46-2024)《建筑施工计算手册》(中国建筑工业出版社)二、工程概况*楼建筑占地面积*平方米,总建筑面积*平方米,地上*平方米,地下*平方米。地上*层,地下*层。在临电设计方面:由于临时供电由承包人从招标人指定的现场内400V电源点挂表接入,并负责配电设施的设计、安装、维护和管理,施工用电的设计、安...