岩溶区嵌岩冲孔桩设计及缺陷处理岩溶区嵌岩冲孔桩设计及缺陷处理 摘要:某岩溶地区桩基在施工前逐桩进行了超前钻探,初步探明了溶洞和桩底完整持力层位置,但钻芯检测发现,溶岩密集区的部分桩底持力层仍存在溶洞,针对缺陷桩进行了高压旋喷注浆、试验验证和其他处理方法,最后提出设计建议
关键词:溶洞;超前钻;嵌岩桩;高压旋喷注浆 中图分类号:TU 文献标识码:A 文章编号: Abstract: Advanced drillings are used at the position of each pile in karst region which can reveal the position of solution cavities and intact bearing layer; however, solution cavities are still found by core drilling method in the bearing layer of some piles in the intensive area of solution cavities
Hence high pressure jet grouting technique, experimental verification and other methods have been adopted
Design suggestions are put forward afterwards
Key words: solution cavity; advanced drilling; socketed pile; high pressure jet grouting 1 工程概述 某工程由 1 栋 32 层、5 栋 26 层高层住宅和二层商业裙房组成,高层塔楼采纳钢筋混凝土剪力墙结构、裙房采纳框架结构,