2x600MW 锅 炉 主 要 施 工 方 案Hisar2×600MW Boiler Main Erection Plan本期建设规模2×600MW燃煤发电机组
锅炉由SEC提供
锅炉为亚临界参数、强制循环、一次中间再热、单炉膛平衡通风、固态排渣、露天布置、全钢构架的∏型汽包炉
This project is 2×600MW coal fired thermal units, boiler shall be supplied by SEC
The boiler is all steel structural ∏ type drum boiler of a subcritical parameter, pump circulation, single reheat, single furnace balance draft, dry slagging and hypaethral placement
锅 炉 施 工 方 案 Boiler Erection Plan锅炉为上海电气集团生产的亚临界参数、强制循环、一次中间再热、单炉膛平衡通风、固态排渣、露天布置、全钢构架的∏型汽包炉
The Boiler shall be supplied by SEC
The boiler is all steel structural ∏ type drum boiler of a subcritical parameter, pump circulation, single reheat, single furnace balance draft, dry slagging and hypaethral placement
1 施工场地及主吊机械 Erection site and main hoisting equipments1
1 施 工 场 地 布 置 Erection sit