目 录一、项目概况.....................................................1二、 施工组织....................................................1三、施工前期准备工作.............................................2四、熟悉图纸和资料,制定进度计划表...............................2五、项目施工.....................................................21、埋件安装....................................................22、埋件安装工艺流程示意图......................................33、启闭机安装方案..............................................34、闸门安装方案................................................45、主要施工机具一览表..........................................56、土建准备工作.................................................57、 吊装方案...................................................58、安装进度表..................................................7六、施工技术管理.................................................8七、施工质量管理.................................................8八、施工安全管理.................................................9九、验收依据和检验要求..........................................101、验收依据....................................................102、检验要求....................................................11十、工程竣工移交................................................12十一、工程配合..................................................12东小口沟治理工程(昌平段)钢坝闸闸门安装专项施工方案一、项目概况 本项目为北京东小口沟 20m*2m 钢坝工程,主要内容包括:20m×2m 钢坝闸 1 套,2×160KN/320KN 液压启闭机组,电气调试等工作组成,具体设备安装清单如下: 二、施工组织钢坝闸安装工程,施工工作量大,技术性强,工程质量要求高,工期短。为保证安全、高质、高效地完成该工程,并如期交付使用。经公司技术部讨论,决定成立相应的项目组,其人员安排如下:1) 项目经理: 职责:全面负责工程的进度及安装质量,负责与甲方联络、内部协调工作。2) 技术负责人:职责:负责安排日常工作的安排,安装质量的检查以及安全技术交底。3) 质量检验员:职责:负责质量监督、质量检查。4...