目录1、编制目的及适用范围 ··································································22、编制依据 ·············································································23、停工工程概况 ·······································································24、停工部署 ············································································34.1、停工安排 ···········································································34.2、停工期间主要工作内容 ·······························································35、停工具体工作安排及做法 ·······························································35.1、现场清理 ·········································································35.2、成品保护 ·········································································4(1)、钢筋 ··············································································4(2)、地库区域的降水 ····································································4(3)、后浇带部位保护 ···································································6(4)、F区、G区原土保护 ··············...