大连开发区大化PX、PTA场平及填海工程施工组织设计(第二标段)中港第一航务工程局2006年5月18日目录第1章编制说明···························································48第2章工程概况···························································50第3章总体施工进度计划···················································53第4章施工总体安排·······················································55第5章施工测量···························································60第6章主要施工方案······················································62第7章施工组织机构······················································75第8章工程质量保证措施···················································80第9章确保工程进度的技术组织措施·········································93第10章环保、文明施工及安全施工保证措施···································95第11章雨季施工技术措施·················································113第12章拟投入的主要施工机械设备表·······································114第13章劳动力计划表·····················································116第1章编制说明1.1编制说明本次工程投标范围为大连开发区大化PX、PTA场地及填海工程,主要施工内容包括土石方爆破、开挖、回填、填海和临时围堰等。本工程分为两个标段,第二标段挖方556.98万方,就地填方95.38万方,填海461.6万方,临时围堰长950米;第三标段挖方556.31万方,就地填方52.11万方,填海504.2万方,临时围堰长1280米。本施工组织设计根据第二标段施工内容编写。1.2编制依据1.2.1投标人须知及相关材料⑴大连开发区大化PX、PTA场地及填海工程招标文件;⑵大连开发区大化PX、PTA场地及填海工程施工图纸;⑶大连开发区大化PX、PTA场地及填海工程答疑文件。1.2.2执行技术规范和标准⑴交通部《港口工程荷载规范》(JTJ215-98);⑵交通部《港口工程地基规范》(JTJ250-98);⑶交通部《海港水文规范》(JTJ213-98);⑷交通部《水运工程抗震设计规范》(JTJ225-98);⑸交通部《水运工程测量规范》(JTJ203-94);⑹交通部《防波堤设计与施工规范》(JTJ298-98);⑺交通部《港口工程质量检验评定标准》(JTJ221-98);⑻交通部《港口及航道工程设计与施工规范JTJ300—2000》;⑼交通部《港口工程地质勘察规范》(JTJ240-97);⑽交通部《水运工程土工织物应用技术规范》(JTJ/T239-98);⑾《爆破安全规程》GB.6722-2003;⑿《建设项目(工程)劳动安全卫生监察规定》;⒀《环境空气质量标准》(GB3095-1996);⒁《城市区域环境噪音标准》(GB3096-93);⒂《建筑施工场界噪音标准》(GB12523-90);⒃《土壤环境质量标准》(GB15618-1995);⒄《水土保持综合治理》(GB/T16453-1996);⒅国家和地方政府颁布的其他有关法规和规范;在合同履行期间,上述及相关标准和规范在执行中如有修改或重新颁布,经甲方代表及监理工程师确认后,施工时将遵照执行。第2章工程概况2.1工程地理位置本工程位于大连开发区大孤山半岛的南端,大连30万吨矿石码头西侧,距大窑湾港区约4公里。北侧靠山,南侧水域开阔,场区岸线呈西北—东南走向,岸线前...