北京丰台科技园酒店公寓脚手架工程施工方案目录1编制依据..................................................................12工程概况..................................................................13.施工安排.................................................................14.施工准备.................................................................14.1组织管理机构................................................14.2施工人员....................................................24.3材料......................................................25.施工条件..................................................................36.脚手架设计...............................................................36.1立杆......................................................46.2大横杆......................................................56.3小横杆......................................................56.4扫地杆......................................................56.5底座及垫板..................................................66.6剪刀撑......................................................66.7连墙杆......................................................66.8门洞......................................................76.9安全防护网..................................................86.10双排架脚手板...............................................86.11地下室外脚手架.............................................96.12地上脚手架................................................106.13室内脚手架................................................107.施工方法................................................................117.1搭设.....................................................117.2拆除.....................................................128.质量要求................................................................129.安全....................................................................1310.影响脚手架承载力的因素.................................................1411.安全文明施工...........................................................14附1脚手架计算............................................................16附2出料平台设计...........................................................20第3页共28页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第3页共28页1编制依据1.1《建筑施工安全检查标准》JGJ59-991.2《建筑施工高处作业安全技术规范》JGJ80-911.3《建筑施工扣件式钢管脚手架安全技术规程》JGJ130-20011.4《建筑安装工程安全生产文明施工资料手册》1.5《扣件式钢管脚手架搭设要求与设计计算》1.6《建筑结构长城杯工程质量评审标准》DBJ/T01-69-20031.7《1#楼酒店公寓等3项》施工图及施工组织设计。2工程概况2.1工程位置:北京市丰台科技园区15-C。2.2结构设计与施工概况:工程概况表一般情况工程名称1#楼酒店公寓等3项建设单位北京天华宏业房地产开发有限公司建设用途住宅、商业设计单位北京希埃希建筑设计院建设地点丰台科技园区15-C监理单位北京京龙工程建设监理公司总建筑面积118458m2施工单位北京市丰台益丰建筑(集团)公司第十八项目部结构类型框架、剪力墙基础类型筏板基础层数地下三层,地上最高三十二层建筑檐高最高99.9m地上面积29865m2地下室面积88593m23.施工安排3.1本工程外墙一圈几乎都有采光井,且在地面处收口,地下部分和地上部分的外脚手架分开搭设。地上有挑檐的搭设双排脚手架,D区无采光井的在二层搭设挑脚手架,其具体布置见后附图。3.2地下部分西面脚手架随地下结构施工进度一同搭设,但根据施工需要,东面、南面和北面地下部分的外脚手架一次性搭到与现场地平面平,坑边...