1Ⅵ施工组织设计目录一、工程概况1、工程名称及规模···························2、工程范围及内容···························3、建筑与结构·····························4、主要工程量·····························5、工期要求······························6、质量要求······························7、安全及环保要求···························8、自然条件······························9、施工条件······························10、相关单位·····························二、施工总体组织及规划1、总体主导思路····························2、项目管理组织····························3、施工队伍部署及任务划分·······················4、施工总平面布置···························5、总体施工组织方案··························6、主要分项工程施工顺序························7、施工工期目标规划··························8、工程质量目标规划··························9、安全、文明施工与环保目标规划····················三、施工进度计划安排1、总工期计划安排···························2、工程项目阶段性目标计划·······················3、施工进度计划横道图、网络图·····················四、劳动力计划安排··························五、主要施工机械设备配备·······················六、主要材料(设备)供应进度计划····················七、主要分部、分项工程施工方案····················1、基坑(槽)土方开挖与回填·······················2、钢筋砼基础·····························3、游泳馆地下室(含游泳池)·······················24、钢筋砼框架·····························5、体操、排球训练馆屋面预应力框架梁··················6、卷材防水保温屋面··························7、脚手架·······························8、钢筋制安······························9、砼制运、浇捣、养护·························10、水泥炉渣空心砌块填充墙······················11、楼地面······························12、内墙及顶棚饰面··························13、外墙干挂花岗岩施工························14、散水、踏步、坡道·························15、电气系统·····························16、给排水、消防系统·························17、暖通、空调系统··························八、保证工期的主要措施························九、工程质量保证措施·························十、保证安全措施···························十一、...