目 录 一、编制依据 ··········································2二、工程概况 ··········································2三、工程重点及难点分析 ································3四、施工部署 ··········································3五、施工工艺流程 ······································5六、施工准备 ··········································6七、施工方案的选择 ····································7八、主要施工方法 ······································10九、质量保证措施 ······································24十、平安保证措施 ······································26十一、进度保证措施 ····································28十二、工程质量检验与验收······························28十三、根底工程检验批划分及试验检验····················29十四、成品保护措施 ····································30一、编制依据〔一〕、万科河运校工程一期根底施工图
〔二〕、勘察院提供的
万科河运校工程一期地质详勘报告
〔三〕、万科河运校工程一期规划局提供的测量放线成果图
〔四〕、国家现行工程质量验收标准及施工验收标准
二、工程概况〔一〕地质概况拟建场地平面上呈近似