工程结算的若干个问题工程结算的若干个问题 摘要: 近些年来,在长期的实践与创新进展过程中,国内工程结算管理工作已经有了较大的进展与进步,现在基本实现工程预结算管理工作的科学化、现代化。然而在结算管理工作中也不可避开的出现了一些问题与弊端,是急需得到改进与完善的。笔者总结了目前工程结算工作中存在的三个方面的主要问题,深化分析了问题的根源。并且针对这些问题提出了相应的措施和方法,并进行了详尽的阐述。 关键词:工程结算;技术措施;现场签证 Abstract: In recent years, in the process of practice and innovation and development of long-term, domestic engineering settlement management work has made significant development and progress, and now the basic realization of scientific, modernization construction budget management. However in the settlement management work but there are also some inevitable problems and shortcomings, it is the need to be improved and perfected. The author summarizes the three main problems of engineering settlement in current work, in-depth analysis of the root of the problem. And puts forward the corresponding measures and methods to solve these problems, and are discussed in detail. Keywords: engineering settlement; technical measures; on-site visa 中图分类号: F830.52 文献标识码:文章编号: 随着社会主义市场经济体制的建立,工程建设管理者的思想观念发生了很大转变。建设单位为合理使用建设资金而精打细算,以猎取更大的投资效益。施工单位在工程利润微薄的情况下,不得不加强管理,不仅对工、料、机消耗量进行认真讨论,甚至对小数点的数值取舍都能提出质疑,以增加合理的经济收入。工程结算是工程建设管理的一个重要环节,也是施工单位获得工程价款实现经济效益的基本手段,更是建设单位拨付工程价款确定工程造价的主要依据。为了防止高估冒算,提高建设工程结算工作质量,合理有效地节约和使用建设资金,保证工程造价的真实性,提高工程建设概预算人员的综合业务素养,就显得非常重要。 一、正确执行预算定额 预算定额是甲、乙双方进行工程结算的主要依据,因而正确执行预算定额则是编制工程结算的有...