BT-QJ02-11XXXXXXXX 扩建工程#3 机组发电机定子冷却水调试方案XXXXXXXX 科学讨论院二〇〇六 年 九 月签字页 批准: 审核: 编写: 目 录1 编制依据.............................................................................................12 调试目的.............................................................................................13 调试对象及范围.................................................................................14 应具备的条件及准备工作.................................................................35 系统工艺流程.....................................................................................46 调试步骤、作业程序.........................................................................47 调试验评标准.....................................................................................58 调试所用仪器设备.............................................................................59 环境、职业健康、安全风险因素控制措施.....................................510 联锁保护及热工信号试验项目.......................................................611 组织分工...........................................................................................61 编制依据1.1《电力建设施工及验收技术法律规范汽轮机组篇》。1.2 发电机定子冷却水系统说明书。1.3 定子冷却水系统及设备连接图。2 调试目的对定子冷却水系统及其辅助设备和相关管道系统进行调整并考核动态运行性能,确认其性能符合制造、设计及生产要求,能满足机组的运行需要。3 调试对象及范围3.1 系统简介定子冷却水系统是一个组装式的闭式循环系统,定子线圈冷却水通过外部进水管进入发电机励端定子机座内的环形总进水管,其中一路通过绝缘水管流入定子线棒中的空心导线,然后从线圈的另一端(汽端)经绝缘引水管汇入环形出水管;另一路经绝缘引水管流入定子线圈主引线,出主引线后经绝缘引水管汇入安置在出线盒内的出水管,然后也经外管道汇入汽端环形出水管。双路水流最后从汽端机座上部流出发电机,经总出水管返回到水箱。环形进水管和出水管的顶部通过一根排气管相互连接,排气管直接与水箱相通,用以排出定子线圈中的气体。该排水管还可以...