施工组织设计目录一、编制说明························二、编制依据························三、工程概况························1、工程名称及规模······················2、工程范围及内容······················3、建筑与结构························4、电气工程·························5、给排水工程························6、采暖工程·························7、材料做法·························8、工期要求·························9、质量要求·························10、安全及环保要求·····················11、自然条件························12、施工条件························13、相关单位························二、施工总体组织及规划···················1、总体主导思路·······················2、项目管理组织·······················3、施工队伍部署及任务划分··················4施工准备··························5、各部门职责························6施工总平面布置·······················7、总体施工组织方案·····················8、施工工期目标规划·····················9、工程质量目标规划·····················10、安全、文明施工与环保目标规划··············三、施工进度计划安排····················1、总工期计划安排······················2、工程项目阶段性目标计划··················3、施工进度计划横道图····················四、劳动力计划安排·····················五、主要施工机械设备配备··················六、主要材料(设备)供应进度计划···············七、主要分部、分项工程施工方案···············7.1、施工测量························7.2基坑(槽)土方开挖与回填·················7.3基础工程施工·······················7.4模板工程·························7.5钢筋工程························7.6砼工程·························7.7砖砌体工程施工·····················7.8室内墙面、天棚装修····················7.9窗安装··························7.10普通地砖地面······················7.11外墙外保温·······················7.12脚手架工程·······················7.13屋面防水施工······················7.14卫生间防水施工·····················7.15抹灰··························7.16乳胶漆饰面·······················7.17墙面贴瓷砖·······················7.18散水、踏步、坡道····················7.19电气系统························7.20给排水、消防系统··············...