SCCCNCEC土耳其天然气项目静止设备施工方案目录1编制依据...................................................................................................................12工程概况...................................................................................................................23施工技术方案...........................................................................................................44施工准备...................................................................................................................55设备安装...................................................................................................................76设备的二次灌浆.......................................................................................................97附属构件、附件与内件的安装................................................................................99大型设备吊装人员组织体系图............................................................................1110安全技术措施.......................................................................................................1111施工工机具一览表...............................................................................................1212.施工措施用料计划...............................................................................................1313施工所需劳动力一览表.......................................................................................141编制依据reference1.1设备安装图纸(中国天辰工程有限公司提供的施工图纸)drawingsofequipmentinstallation(providedbyTCC)1.2《机械设备安装工程施工及验收通用规范》(GB50231-2009)Constructionandgeneralacceptancespecificationformechanismequipmentinstallation1.3《中低压化工设备施工及验收规范》(HGJ209-1983)constructionandacceptancespecificationformediumorlowpressurechemicalequipment1.4《化工塔类设备施工及验收规范》(HGJ211-1985)constructionandacceptancespecificationforchemicaltowerequipment0SCCCNCEC土耳其天然气项目静止设备施工方案1.5《石油化工换热设备施工及验收规范》(SH3532-2005)constructionandacceptancespecificationforpetrochemicalexchangers1.6《现场设备、工业管道焊接工程施工及验收规范》(GB50683-2011)weldingconstructionandacceptancespecificationforfieldequipmentandindustrialpipe1.7《施工现场临时用电安全技术规范》(JGJ46—2005)securityspecificationoftemporaryutilizationofelectricpoweronconstructionsite2工程概况projectoverview2.1Projectname:TuzGölüUndergroundNaturalGasStorageProject2.2工程参建相关单位:Relevantunitsjointingintotheproject建设单位:Developmentorganization设计单位designunit:中国天辰工程有限公司TCC施工单位constructionunit:中国化学工程第六建设有限公司SCCCNCEC3施工技术方案technicalschemeofconstruction3.1施工方法constructionmethods设备一般采用吊车就位,对于安装位置不宜用吊车的设备,采用卷扬机或倒链就位,安装顺序应结合钢结构的施工程序进行。Craneisgenerallyusedtopositionequipment.Windlassorchainfallshallbeadoptedinpositionthatcraneisnotsuitable.Installingsequenceshallcomplywith1SCCCNCEC土耳其天然气项目静止设备施工方案constructionprocedureofsteelstructure.3.2安装在混凝土基础上的设备安装程序:Installationprocedureofequipmentonconcretefoundation4施工准备preparationforconstruction4.1施工技术准备preparationforconstructiontechnology4.1.1参加由建设单位组织的四方(设计单位,建设单位,监理单位,施工单位)图纸会审,并做好记录。Contractorsh...