关于群体工程钢筋管控的思考与探究苟蓬勃(中建三局建设工程股份有限公司工程总承包公司)摘要:群体工程钢筋原材进场是间断的,钢筋现场消耗是连续的,各楼栋及各楼层节点的钢筋规格和数量是明确的鉴于群体工程钢筋管控难度大、楼栋多、施工面广的特点,群体工程的施工现场钢筋流向又是难以区分的
本文针对通过对每个钢筋管控阶段进行分析,从而合理、有效地控制群体工程钢筋管理
Abstract:Groups of reinforced raw materials approach is intermittent, reinforced-site consumption is continuous, the each of ban and floors node specifications and quantity is clear
In view of the groups project reinforced the difficulty of control, multi-storied building, the construction of a wide range of features, the groups reinforced the flow of the construction site of the project and it is difficult to distinguish
In this paper, each reinforced control stage, thereby reasonable control group project reinforced management
关键词:群体工程;钢筋流向;钢筋管控阶段;钢筋管理Key words:Groups of engineering;the flow of Reinforced;Reinf