第1页共43页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共43页目录1、工程概况及特点······················11.1工程概况·························11.2工程特点·························32、施工现场组织机构·····················32.1组织机构关系图······················32.2工程主要负责人简介····················33、施工现场总平面布置图···················43.1现场平面布置图······················43.2现场平面布置图说明····················44、施工方案·························44.1施工准备·························54.2施工工序总体安排·····················94.3主要工序和特殊工序的施工方法···············94.4冬季施工方案·······················95、工期及施工进度计划····················135.1工期规划及要求······················145.2施工进度横道图······················145.3施工进度网络图······················145.4施工进度网络图说明····················145.5确保工期所采取的措施···················145.6主要安装设备及材料供应计划················156、质量目标、质量保证体系及技术组织措施···········156.1质量目标·························156.2质量管理组织机构及主要职责················166.3质量管理措施·······················196.4质量管理及检验标准····················23第2页共43页第1页共43页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第2页共43页6.5质量保证技术措施·····················247、安全目标、安全保证体系及技术组织措施···········257.1安全管理目标·······················257.2安全管理组织机构及主要职责················267.3安全管理制度及办法····················327.4安全组织技术措施·····················347.5针对本工程特点,分析安全薄弱环节,似将采取的技术措施····347.6重要施工方案和特殊施工工序的安全过程控制·········358、环境保护及文明施工····················368.1环境保护·························368.2加强施工管理、严格保护环境················378.3文明施工的目标、组织机构和实施方案············408.4文明施工考核、管理办法··················429、计划、统计和信息管理···················439.1计划、统计报表的编制与传递················439.2信息管理·························44第3页共43页第2页共43页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第3页共43页1工程概况及特点1.1工程概况1.1.1工程简述工程名称:220kV变电站增容工程建设单位:山西省电力公司设计单位:长春东电电力工程有限公司建设地点:计划开工日期:2013年05月10日计划竣工日期:2013年10月30日本扩建工程在原场地内进行,无新征地。1.1.2变电站土建扩建规模扩建内容:本期为主变增容工程,土建部分内容如下。220KV设备支架基础(隔离开关支架基础2组,棒形支柱绝缘子支架基础5组,3150A型隔离开关支架基础1组,接地开关支架基础4组,分析断路器基...